wp_20170225_12_20_02_proTo Walter de Grasse

Dear Walter,

I’m making progress in Old School Garden– well, sort of. Having a solid five hour stint the other day I was pleased to see some of the front borders looking tidier, and hopefully, largely clear of the ground elder that had started to take over. Here ate the results; both borders now have repositioned roses which will eventually have a spread of Stachys byzantina surrounding them and for late summer/autumn a good number of Nerine bowdenii

Part of this day also involved removing the large clumps of Nepeta that had become too over powering around the roses. I have these in a barrow ready to fill another border that’s in the process of being cleared (and some will also go along the edges of a tunnel of climbing roses. I picked up some Convallaria bulbs (‘Lily of the Valley’) the other day and plan to under plant the Nepeta with these to provide a nice flowering combination- and some scent.

I’ve also carried on with the pruning and tidying elsewhere, but this is a long job and I can see quite a few bonfires on the way! The old cherry tree stump that has been acting as a base for a bird bath has finally rotted away in the ground so I’ve removed it (more firewood!).

wp_20170225_12_19_26_proI can report that my hip is holding up well so far, and I’m (very) gradually building up my muscle strength. I’m due to see a physiotherapist next week, so maybe I’ll have some other useful advice on what else I should be doing. The other day we had that ‘named storm’ called Doris pass by. How were you affected? I imagine possibly quite badly living up north as you do. Did you lose power, have any upturned trees etc? Fortunately we got away fairly lightly; a few garden furniture items fell over, and one pot toppled and cracked…

wp_20170225_08_11_21_proStill, the days are lengthening and some late winter/early spring flowers are doing their stuff…

I had a very interesting visit to a horticultural and associated workshop called ‘The Mount’ which is located next door to (and used by) a unit for those with mental health problems on the edge of Norwich. It’s been going for about 25 years and I was inspired to hear about the many ways the staff engage the service users in all manner of construction and growing projects. We could see an outdoor oven in the course of construction and took a look at the greenhouses and raised beds which are used extensively to grow all sorts of food and other crops. ..

Around 20 service users are involved regularly. I joined a small group of people interested in setting up something similar at a nearby Psychiatric Hospital. We had a good talk about their plans and ideas and I’m going to be involved in helping to develop the project. You may recall I mentioned before my role in a similar project called ‘The Grow Organisation’ on the other side of Norwich. I hope that we can help these and other projects to work together and perhaps to form a useful network of horticultural therapy projects in the area to benefit a wide range of people with mental and other health issues.

My other garden-related project involved spending nearly six hours last week dismantling a greenhouse!  Whilst doing our regular weekly shop we spotted an advert offering the greenhouse for free to anyone willing to dismantle it. We immediately thought of ‘The Allotment Project’ at the local High School and as we suspected the leader of that project, Matt, was enthusiastic about getting it. So having transported it over a few days ago (sadly there were a couple of glass breakages in transit and I had a gashed head for my troubles) yesterday I  went over to help with the process of installing it. Matt and I discussed location and settled, eventually, on a spot opposite the existing poly tunnel. Here are some  pictures…

Fortunately Matt had a few Railway Sleepers which we decided to use as the base, sunk in the ground and which the base of the frame could be screwed to. It was just as tricky reassembling the ends of the house as it was dismantling them- lots of nuts and bolts and very little room to get in a spanner. Still, I left yesterday with the base well on the way to being installed and the frame in a state where it can be fixed. So I’ll be returning next week to help finish off the job. A couple of other guys worked on finishing off the Chicken coop (formerly a childrens’ play house!) and I was also pleased to see that the Broad Beans I’d helped some students sow in the Autumn were coming along nicely (see pics above).

Back home, I’ve reached some conclusions on rearranging the kitchen garden, so hope in the next few weeks to get some of the trellis moved and a new fruit cage created for the raspberries and currants. I’m yet to finalise the position of the three gooseberry bushes I have, but I’m going to take a chance on putting these out in a sunny position in the open. I hope that you and Lise are looking forward to your spring break in Switzerland…you must tell us all about it when we see you at Easter.

 Old School Gardener

Save

Save

Save

Save

Save

Save

Advertisement